Modular Power Plant & Packaged Power Station

Modular Power Plant

Enclosure Type
Power Plant

Aux. Equipment
Modularized Power Plant

Packaged Power Station

The Components And Structure

Suitable for:
  • Small Independent Power Producers (IPPs) with limited budgets
  • Those who need power quickly
  • Areas not connected to the national grid
  • Places where building infrastructure (like high-voltage lines) is difficult
  • Small towns and remote areas
Fast Delivery And Installation
The entire process: manufacturing, transportation, installation, and commissioning for example, a 20MW PPS takes just 9 months.
Easily Transferable
Reinstallation of one PPS unit takes just 2 weeks. Even with additional units, no extra time is required.
Easy to Transport
Simple installation steps save time.
Manufacturing: 5 months
Transportation: 1.5 months
Installation: 1.5 months
Commissioning: 1.5 months
Fast Delivery And Installation
The entire process: manufacturing, transportation, installation, and commissioning for example, a 20MW PPS takes just 9 months.
Fast Delivery And Installation
The entire process: manufacturing, transportation, installation, and commissioning for example, a 20MW PPS takes just 9 months.
Fast Delivery And Installation
The entire process: manufacturing, transportation, installation, and commissioning for example, a 20MW PPS takes just 9 months.